Honda Accord

1998-1999 of release

Repair and car operation



Honda Chord
+ Honda Accord brand Cars
+ Settings and routine maintenance
+ Engine
+ Systems of cooling, heating
+ Power supply system and release
+ engine Electric equipment
+ Engine management
+ gear shifting Box
- Coupling and power shafts
   Coupling - the general information and check of a condition of components
   Removal and installation of the main cylinder of coupling
   Removal and installation of the executive cylinder of coupling
   Air removal from a hydraulic path of a drive of switching off of coupling
   Removal, check of a condition and installation of components of assembly of coupling
   Removal, check of a condition and installation of the vyzhimny bearing and fork of switching off of coupling
   Adjustment of a pedal of coupling
   Condition check, replacement and adjustment of the sensor switch of disconnection of a chain of a starter
   Removal and installation of power shafts
   Removal and installation of an intermediate shaft
   Replacement of protective covers and check of a condition of CV JOINTS
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ electric equipment Schemes





Replacement of protective covers and check of a condition of CV JOINTS

At detection of defects of a protective cover the condition of the corresponding CV JOINT should be carefully studied. Often on an exchange basis it is possible to get completely restored assemblies of power shafts that considerably simplifies a situation and allows to reduce temporary expenses. Before starting dismantle of components, carry out marketing, having found out the prices for necessary spare parts. Compare them costs of acquisition of the restored assemblies.

In shops of automobile accessories it is possible to meet cutting protective covers for CV JOINTS. Installation of such covers does not demand shaft dismantle from the car that in principle it is very convenient. However, originators of the real Management recommend to remove nevertheless shaft for check of a condition of CV JOINTS and than stuffing them is fresher greasing.


 PERFORMANCE ORDER

1. Remove a power shaft (see. Section Removal and installation of power shafts).
2. Clamp the removed shaft in a vice with soft sponges.

Internal CV JOINT

Dismantling

 PERFORMANCE ORDER

1. Estimate an external condition of a protective cover of the CV JOINT, in the presence of the slightest doubts it is necessary to replace a cover. Cut off bandage tapes of fastening of a cover and shift the last from the hinge to the shaft center.

2. Previously having carefully wiped components, paint, or by means of a chertilka mark the provision of assembly of the tripodny bearing on the relation to an external holder of the hinge. Remove a holder from the bearing.

3. Remove a spring lock ring from an external pin of a shaft.

4. Fix bearing rollers, having wound them with an adhesive tape, then bring down tripodny assembly from a shaft, having used a hammer and a brass drift.

5. Take a lock ring and remove an old protective cover from a power shaft.

CHECK

 PERFORMANCE ORDER

1. Carefully remove greasing traces from an external holder of the hinge and cavities of the tripodny bearing. Serially, not to mix, remove each of sections of tripodny assembly and wash out rollers of needle bearings solvent.
2. Check rollers, the bearings, bearing part of tripodny assembly and an external holder of the hinge on existence of signs of excessive wear of cavities, задиров, cracks and other mechanical damages. In case of need replace the CV JOINT.

ASSEMBLY

 PERFORMANCE ORDER

1. Wrap up shlitsa of a pin of a power shaft an adhesive tape for protection of a new cover the CV JOINT from cuts.

2. Put on a cover a shaft, remove an adhesive tape and plant an internal lock ring.

3. Plant on a shaft tripodny assembly.

4. Fix tripodny assembly by an external lock ring.

5. With special dense greasing grease inside of needle roller bearings for the purpose of temporary fixing them on bearing elements of tripodny assembly. Track, that each roller was established strictly on the former place.

If rollers are equipped a lysky rectangular shape, track, that they were established to this lysky to a shaft.

6. Half fill an external holder of the hinge the greasing delivered complete with a new cover. The remains of greasing fill a cover. Establish an external holder on a shaft. Track correctness of combination of the labels of mutual situation of a holder put in the course of dismantle and the tripodny bearing.

7. Fill cover sponges in flutes on an external holder of the hinge and a shaft body, then adjust length of assembly of a shaft according to requirements of Specifications.

8. Having exposed length of a shaft, let the air out from under a cover, having hooked its external (bigger diameter) edge a stupid screw-driver. Try not to damage a cover.

9. Fix a cover new bandage tapes/collars.

 

10. Establish shaft assembly on the car (see. Section Removal and installation of power shafts).

External CV JOINT

Dismantling

 PERFORMANCE ORDER

1. Operating according to the instructions stated in paragraphs with 1-5, remove from a power shaft the internal CV JOINT and disassemble it.
2. If the shaft is equipped with a damper of dynamic loadings, mark with paint position of external edge of dempferny assembly concerning a shaft, then cut off a collar and remove a damper.

At replacement of components it is necessary to track distance observance between a cover of the internal CV JOINT and a damper (see. Specifications).

3. Cut off bandage tapes and remove from a shaft a protective cover of the CV JOINT.

The external CV JOINT is not subject to dismantling and removal from a shaft.

CHECK

 PERFORMANCE ORDER

1. Carefully wash out internal and external CV JOINTS solvent, then dry them with application of the compressed air.

When using the compressed air do not forget to put on goggles!

As the external CV JOINT is not subject to dismantling, removal of traces of old greasing from it and solvent is connected with certain difficulties, however should be made very carefully.

2. Turning under various corners a hinge casing, attentively study a condition of balls, holders and a bearing separator. In case of detection of defects replace shaft assembly.

ASSEMBLY

 PERFORMANCE ORDER

1. Wrap up shlitsa of a pin of a power shaft an adhesive tape for protection of a new cover of CV JOINTS against cuts. Put on a cover a shaft, remove an adhesive tape, then fill in a cover the greasing enclosed in a remnabor. Give a cover into position and fix it new bandage tapes.

2. At the corresponding complete set of the car plant on a shaft a damper of dynamic loadings. Track, that the external edge of a damper appeared is placed according to the labels put in the course of dismantle.

At shaft replacement assembled with the external hinge the damper is leveled rather protective cover of the external CV JOINT according to results of the measurement made in paragraph 20.

3. Wash out and collect assembly of the internal CV JOINT (see paragraphs with 8 on 17). Establish assembly of a power shaft on the car (see. Section Removal and installation of power shafts).