Honda Accord

1998-1999 of release

Repair and car operation



Honda Chord
+ Honda Accord brand Cars
+ Settings and routine maintenance
+ Engine
+ Systems of cooling, heating
+ Power supply system and release
+ engine Electric equipment
+ Engine management
+ gear shifting Box
- Coupling and power shafts
   Coupling - the general information and check of a condition of components
   Removal and installation of the main cylinder of coupling
   Removal and installation of the executive cylinder of coupling
   Air removal from a hydraulic path of a drive of switching off of coupling
   Removal, check of a condition and installation of components of assembly of coupling
   Removal, check of a condition and installation of the vyzhimny bearing and fork of switching off of coupling
   Adjustment of a pedal of coupling
   Condition check, replacement and adjustment of the sensor switch of disconnection of a chain of a starter
   Removal and installation of power shafts
   Removal and installation of an intermediate shaft
   Replacement of protective covers and check of a condition of CV JOINTS
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ electric equipment Schemes





Removal and installation of an intermediate shaft

REMOVAL

 PERFORMANCE ORDER

1. Weaken nuts of fastening of the left forward wheel. To Poddomkratta a car front also establish it on props. Remove a wheel.
2. Merge transmission oil (see. Head of Control and routine maintenance).
3. Remove a dempferny fork and liberate the bottom control lever of a suspension bracket from assembly of a rotary fist (see. Head Suspension bracket and steering).
4. Having hooked the lever for a casing, liberate a pin of the internal CV JOINT from assembly of an intermediate shaft. Take a power shaft aside and tie up it a wire to a suspension bracket element (at all do not leave a power shaft hanging on the external CV JOINT!).

5. Turn out three bolts of fastening of a support of the bearing of an intermediate shaft to the engine block. Take a shaft from transmission, - try not to damage a differential epiploon.

6. Check freedom of rotation of the basic bearing (holding the bearing, rotate a shaft). In case of identification of breakthroughs and jamming points it is necessary to deliver assembly of a shaft in a car-care center workshop as replacement of the bearing is made by means of the special tool.

INSTALLATION

 PERFORMANCE ORDER

1. Grease epiploon sponges in a case of transmission with universal greasing. Accurately fill a pin of an intermediate shaft in a nest of a lateral gear wheel of differential. Screw bolts of fastening of a support of the bearing and tighten them with demanded effort.
2. Establish a new spring lock ring on a pin of the internal CV JOINT of a power shaft, then fill a pin in assembly of an intermediate shaft.
3. Connect the bottom lever of a suspension bracket to a rotary fist, tighten with demanded effort (see. Specifications to Head the Suspension bracket and a steering) a nut of a finger of a spherical support. Establish a dempferny fork and tighten its fixture with demanded effort (see. Specifications to Head the Suspension bracket and a steering).
4. Establish a wheel, lower the car on the earth and tighten nuts of fastening of a wheel with demanded effort (see. Specifications to Head of Control and routine maintenance).
5. Fill in in transmission necessary amount of oil of a demanded grade (see. Head of Control and routine maintenance).