Honda Accord

1998-1999 of release

Repair and car operation



Honda Chord
+ Honda Accord brand Cars
+ Settings and routine maintenance
- Engine
   + Four-cylinder engines
   + V6 Engines
   - General and major maintenance of the engine
      Check of pressure of oil
      Check of kompressionny pressure in cylinders
      Diagnostics of a condition of the engine with use of the vacuum gage
      Removal of the power unit from the car - preparation and precautionary measures
      Removal and engine installation
      Alternative versions of schemes of regenerative repair of the engine
      Order of dismantling of the engine by its preparation for major maintenance
      Dismantling of a head of cylinders
      Cleaning and check of a condition of a head of cylinders
      Service of valves
      Assembly of a head of cylinders
      Removal and check of a condition of balancing shaft (4-cylinder engines)
      Removal of shatunno-piston assemblies
      Removal of a cranked shaft
      Cleaning of the block of the engine
      Check of a condition of the block of the engine
      Honingovaniye of mirrors of cylinders
      Check of a condition of components of shatunno-piston group
      Check of a condition of a cranked shaft
      Check of a condition and selection of loose leaves of radical and shatunny bearings of a cranked shaft
      Engine assembly order
      Installation of piston rings
      Installation of a cranked shaft and check of working gaps of radical bearings
      Installation of a back epiploon of a cranked shaft
      Installation of shatunno-piston assemblies and check of size of working gaps in shatunny bearings of a cranked shaft
      Installation of balancing shaft (four-cylinder engines)
      Trial start and engine running in after major maintenance
+ Systems of cooling, heating
+ Power supply system and release
+ engine Electric equipment
+ Engine management
+ gear shifting Box
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ electric equipment Schemes





Installation of a back epiploon of a cranked shaft

 PERFORMANCE ORDER

1. Before приболчивать to the engine the holder with the new epiploon established in it, establish into place a cranked shaft and covers of radical bearings / their connecting bridge.
2. Carefully check a surface of a pin of a shaft contacting to an epiploon on existence of scratches, задиров and the other defects, capable to bring to failure of a new epiploon. The damaged shaft replace.

3. Measure regular depth of landing of an old epiploon in a nest of the holder, then lay a plate of the holder edges on pair of wooden blocks of equal height and by means of a suitable drift and a hammer beat out an old epiploon from the nest. Try not to damage nest walls.

4. Carefully wipe the holder, then grease external edge of a new epiploon with pure impellent oil. The epiploon should be planted in a nest strictly perpendicularly therefore it is not recommended застукивать it in the holder by a hammer.

5. In the absence of access to a press it is possible to fill an epiploon in a nest by means of a big vice with soft sponges. The holder with an epiploon should be clamped between two flat wooden whetstones providing uniform distribution of loading on all area of a face surface of an epiploon. As a last resort, hammer use, however a zastukivaniye is allowed should be made through flat wooden whetstone. Act slowly, watch, that there was no distortion.

6. Before putting on assembly of the holder with an epiploon a pin of a cranked shaft, grease epiploon sponges with universal greasing. The holder is put on the engine without laying, - instead it is necessary to impose a uniform pillow of anaerobny hermetic in width of 2 mm on its interfaced surface.
7. Having pressed the holder closely to the block, by hand acquire bolts of its fastening, make sure of correctness of installation of the holder, then tighten bolts with demanded effort.