Honda Accord

1998-1999 of release

Repair and car operation



Honda Chord
+ Honda Accord brand Cars
+ Settings and routine maintenance
- Engine
   + Four-cylinder engines
   + V6 Engines
   - General and major maintenance of the engine
      Check of pressure of oil
      Check of kompressionny pressure in cylinders
      Diagnostics of a condition of the engine with use of the vacuum gage
      Removal of the power unit from the car - preparation and precautionary measures
      Removal and engine installation
      Alternative versions of schemes of regenerative repair of the engine
      Order of dismantling of the engine by its preparation for major maintenance
      Dismantling of a head of cylinders
      Cleaning and check of a condition of a head of cylinders
      Service of valves
      Assembly of a head of cylinders
      Removal and check of a condition of balancing shaft (4-cylinder engines)
      Removal of shatunno-piston assemblies
      Removal of a cranked shaft
      Cleaning of the block of the engine
      Check of a condition of the block of the engine
      Honingovaniye of mirrors of cylinders
      Check of a condition of components of shatunno-piston group
      Check of a condition of a cranked shaft
      Check of a condition and selection of loose leaves of radical and shatunny bearings of a cranked shaft
      Engine assembly order
      Installation of piston rings
      Installation of a cranked shaft and check of working gaps of radical bearings
      Installation of a back epiploon of a cranked shaft
      Installation of shatunno-piston assemblies and check of size of working gaps in shatunny bearings of a cranked shaft
      Installation of balancing shaft (four-cylinder engines)
      Trial start and engine running in after major maintenance
+ Systems of cooling, heating
+ Power supply system and release
+ engine Electric equipment
+ Engine management
+ gear shifting Box
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ electric equipment Schemes





Assembly of a head of cylinders

 PERFORMANCE ORDER

1. Regardless of that, the head went to a workshop for carrying out service of valves, or not, before starting its assembly, once again carefully check purity of all components.
2. After head return from a workshop in it valves with accompanying components will be already established. In this case it is necessary to omit procedures of the following five paragraphs and at once to pass to the actions described in paragraph 8.

3. First of all establish on directing plugs of valves of a saddle of their springs, then put on each of directing plugs a new maslootrazhatelny cap. Maslootrazhatelnye caps (inlet and final valves) "are put" on the directing plugs by a careful zastukivaniye by a hammer through a special opravka or a face head of the suitable size.

Stop a cap zastukivaniye right after that as it completely "will sit down" on the plug - further blows can lead to rubber damage. Track, that caps did not appear are overwound on plugs.

Maslootrazhatelnye caps of inlet and final valves differ on a standard size and are marked with a color code - do not mix them.

4. Moving from one end of a head to another, grease with molibdensoderzhashchy or assembly impellent greasing the first valve and plant it in a head. A core of the valve grease with pure impellent oil.

5. By means of a noniusny calliper serially check adjusting height of cores of each of valves (distance from a saddle of springs to a face surface of a core of the valve).

If repair of a head was made in a car-care center workshop, this parameter already will be adjusted properly.

If the result any of measurements exceeds admissible value according to Specifications, replace the corresponding valve and repeat check. If replacement of the valve does not lead to situation correction, therefore, the valve saddle too deeply is planted in a head and the last is subject to replacement.

6. Plant on a core klapanny springs and their plate.

Springs are established to Klapannye by rounds with the truncated step to a head.

7. The special tool compress springs, having lowered a plate, then establish in the opened flute on a valve core crackers of the cutting lock. For the purpose of temporary fixing of crackers to an otpuskaniye of the tool grease them from the inside with dense greasing.

8. Repeat procedure for the remained valves. Watch that all components were established strictly on the former places.
9. Camshaft installation (ов) and assemblies of yokes is made after the head will be completed in the reduced set (see. Section Alternative versions of schemes of regenerative repair of the engine).