Honda Accord

1998-1999 of release

Repair and car operation



Honda Chord
+ Honda Accord brand Cars
+ Settings and routine maintenance
- Engine
   + Four-cylinder engines
   - V6 engines
      Preparatory actions and the list of repair procedures which can be executed without engine extraction from the car
      Reduction of the piston of the first cylinder in the provision of the top dead point (VMT)
      Removal and installation of covers of heads of cylinders
      Removal and installation of the inlet pipeline
      Removal and installation of final collectors
      Removal, check of a condition and installation of a gas-distributing belt and cogwheels of a drive of GRM
      Replacement of a forward epiploon of a cranked shaft
      VTEC system - the general information
      Removal, check of a condition and installation of assembly of yokes
      Removal, check of a condition and installation of camshafts
      Replacement of maslootrazhatelny caps and klapanny springs with plates
      Removal and installation of heads of cylinders
      Removal and installation of the pallet of a case of the engine
      Removal, check of a condition and installation of the oil pump
      Removal and installation of a driving disk
      Replacement of a back epiploon of a cranked shaft
      Check of a condition and replacement of support of a suspension bracket of the power unit (V6 Engines)
      System of correction of a suspension bracket of the power unit - the general information and check of serviceability of functioning
   + General and major maintenance of the engine
+ Systems of cooling, heating
+ Power supply system and release
+ engine Electric equipment
+ Engine management
+ gear shifting Box
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ electric equipment Schemes





Removal and installation of final collectors

Start procedure performance only after final cooling of the power unit.

REMOVAL

 PERFORMANCE ORDER

1. Disconnect a negative wire from the battery.

If the stereosystem established on the car is equipped with a security code before disconnecting the battery make sure that have the correct combination for audiosystem input in action!

2. Impregnate fixture of collectors with getting structure.
3. Prop up protivootkatny boots back wheels. Cock the parking brake and transfer the AT selector lever to the situation "R". To Poddomkratta a car front also establish it on props. Remove the bottom antispray screen.

4. Disconnect from final collectors reception pipes of system of production of the fulfilled gases.

It will be also reasonable to impregnate fixture of pipes with getting structure in advance.

5. Turn out fixing bolts and remove from final collectors thermofilters (fixture also expediently previously to impregnate with getting structure).

6. Give самоконтрящиеся nuts and remove collectors from heads of cylinders.

Самоконтрящиеся nuts at assembly are subject to replacement without fail.

7. Attentively examine both collectors and their fixture on existence of cracks and other mechanical damages, defective details replace.

INSTALLATION

 PERFORMANCE ORDER

1. By means of a scraper remove from interfaced surfaces of final collectors and heads of cylinders the remains of hermetic and traces of a material of old laying. Wipe surfaces the rags moistened in acetone. If suspicions on leaks took place, check planeness of collectors, in case of need give the deformed components to a pro-point.
2. Put on new laying on closed up in heads of cylinders fixing hairpins.
3. Establish collectors, grease hairpins with impellent oil and screw new самоконтрящиеся fixing nuts. Moving from the collector center outside, passing from one fixing element to another in a diagonal order, in three stages tighten nuts with demanded effort.

On collectors identification labels in the form of “F” letters (forward) and “R” (back), not allowing to mix components are provided.

4. The remained components are established as it should be, the return to an order of their dismantle.
5. Start the engine and check it on existence of signs of leakages of the fulfilled gases through joints of final collectors with heads of cylinders and reception pipes of system of release.