Honda Accord

1998-1999 of release

Repair and car operation



Honda Chord
+ Honda Accord brand Cars
+ Settings and routine maintenance
- Engine
   + Four-cylinder engines
   - V6 engines
      Preparatory actions and the list of repair procedures which can be executed without engine extraction from the car
      Reduction of the piston of the first cylinder in the provision of the top dead point (VMT)
      Removal and installation of covers of heads of cylinders
      Removal and installation of the inlet pipeline
      Removal and installation of final collectors
      Removal, check of a condition and installation of a gas-distributing belt and cogwheels of a drive of GRM
      Replacement of a forward epiploon of a cranked shaft
      VTEC system - the general information
      Removal, check of a condition and installation of assembly of yokes
      Removal, check of a condition and installation of camshafts
      Replacement of maslootrazhatelny caps and klapanny springs with plates
      Removal and installation of heads of cylinders
      Removal and installation of the pallet of a case of the engine
      Removal, check of a condition and installation of the oil pump
      Removal and installation of a driving disk
      Replacement of a back epiploon of a cranked shaft
      Check of a condition and replacement of support of a suspension bracket of the power unit (V6 Engines)
      System of correction of a suspension bracket of the power unit - the general information and check of serviceability of functioning
   + General and major maintenance of the engine
+ Systems of cooling, heating
+ Power supply system and release
+ engine Electric equipment
+ Engine management
+ gear shifting Box
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ electric equipment Schemes





Removal and installation of the inlet pipeline

Start procedure performance only after final cooling of the power unit.

Top pipeline

 PERFORMANCE ORDER

1. Dump pressure in a power supply system (see. Head of the Power supply system and release).
2. Disconnect a negative wire from the battery.

If the stereosystem established on the car is equipped with a security code before disconnecting the battery make sure that have the correct combination for audiosystem input in action!

3. Disconnect from the throttle case an inlet air line, drafts of a butterfly valve, and also вше hoses and electroconducting (see. Head of the Power supply system and release). To Zakuporta brought to the throttle case hoses of an okhladitelny path.

4. Remove from the inlet pipeline all plastic covers provided by a design.

5. Operating as it should be, the return specified illustrations, give fixing bolts and nuts and remove the pipeline with the case of a throttle fixed on it.
6. Before installation of the top pipeline carefully smooth out interfaced surfaces bottom, having removed from them all traces of a material of old laying and hermetic. Wipe surfaces the rags moistened in acetone. Put on three fixing hairpins on the bottom pipeline new laying, then establish the top pipeline and tighten fixture with demanded effort in strictly certain order. Check level of cooling liquid, in case of need make the corresponding adjustment (see. Head of Control and routine maintenance).

Bottom pipeline

 PERFORMANCE ORDER

1. Remove the steering pump (see. Head the Suspension bracket and a steering) and not, disconnecting hoses, take him aside.
2. Previously having marked, disconnect electroconducting from injectors of injection of fuel. Remove from the bottom inlet pipeline fuel highways (see. Head of the Power supply system and release).

3. Give fixing bolts and nuts and remove both sections of the bottom inlet pipeline from heads of cylinders. If any of sections "became attached" and does not give in to office, обстучите it on perimeter a hammer.

At all do not make attempts of office of the pipeline by a podrychazhivaniye of its sections for interfaced surfaces, - any mechanical damages of the last are capable to lead to development of leaks.

Injectors of injection of fuel I can be left on the regular places.

4. By means of a scraper from rather soft material accurately clear interfaced surfaces of the pipeline and heads of cylinders of the remains of hermetic and traces of a material of old laying, then wipe their rags moistened in acetone.

5. Lay new laying, then establish on heads of cylinders of section of the bottom inlet pipeline.

Track, that laying by the correct image took place on directing pins. Screw fixture of sections.

6. In three stages tighten fixture with demanded effort. In order to avoid development of deformations, move from the center of sections to their edges, passing from one fixing element to another in a diagonal order.
7. Further installation is made as it should be, the return to an order of dismantle of components.
8. Check level of cooling liquid, in case of need make the corresponding adjustment (see. Head of Control and routine maintenance).
9. Start the engine and check it on existence of leakages of fuel and cooling liquid. Also make sure of absence of losses of depression.