Honda Accord

1998-1999 of release

Repair and car operation



Honda Chord
+ Honda Accord brand Cars
+ Settings and routine maintenance
- Engine
   + Four-cylinder engines
   - V6 engines
      Preparatory actions and the list of repair procedures which can be executed without engine extraction from the car
      Reduction of the piston of the first cylinder in the provision of the top dead point (VMT)
      Removal and installation of covers of heads of cylinders
      Removal and installation of the inlet pipeline
      Removal and installation of final collectors
      Removal, check of a condition and installation of a gas-distributing belt and cogwheels of a drive of GRM
      Replacement of a forward epiploon of a cranked shaft
      VTEC system - the general information
      Removal, check of a condition and installation of assembly of yokes
      Removal, check of a condition and installation of camshafts
      Replacement of maslootrazhatelny caps and klapanny springs with plates
      Removal and installation of heads of cylinders
      Removal and installation of the pallet of a case of the engine
      Removal, check of a condition and installation of the oil pump
      Removal and installation of a driving disk
      Replacement of a back epiploon of a cranked shaft
      Check of a condition and replacement of support of a suspension bracket of the power unit (V6 Engines)
      System of correction of a suspension bracket of the power unit - the general information and check of serviceability of functioning
   + General and major maintenance of the engine
+ Systems of cooling, heating
+ Power supply system and release
+ engine Electric equipment
+ Engine management
+ gear shifting Box
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ electric equipment Schemes





Removal, check of a condition and installation of the oil pump

REMOVAL

 PERFORMANCE ORDER

1. Remove a gas-distributing belt, a cogwheel of a cranked shaft and an intermediate roller (see. Section Removal, check of a condition and installation of a gas-distributing belt and cogwheels of a drive of GRM).

Leave the suspension bracket of the power unit connected a support since the end of the engine turned to a gas-distributing belt.

2. Remove the sensor of provision of a cranked shaft (SKR).

3. Remove the pallet of a case of the engine (see. Section Removal and installation of the pallet of a case of the engine) and mesh filter of a maslozabornik. At the corresponding complete set remove the sensor of level of impellent oil.

4. Remove assembly of a nozzle of the oil filter with the electromagnetic valve of blocking of VTEC (ahead of the oil pump) (see. The section VTEC System - the general information and check of a condition of components).

5. Turn out fixing bolts and separate a casing of the oil pump from the engine. Probably, it is necessary to enter the lever between a cover of the radical bearing and a pump casing.
Check axial люфта gear wheels is made by means of a planeness measuring instrument щупа lezviyny type.

CHECK

 PERFORMANCE ORDER

1. By means of a big screw-driver with a crosswise hall turn out screws of fastening of a cover to a back part of a casing of the pump.

2. Uncover and attentively check a condition of gear wheels of the pump. In case of identification of signs of wear or mechanical damages replace the pump. Make measurement of working gaps of the pump, compare results of measurements to requirements of Specifications.

3. Scratch out from interfaced surfaces of the pump and the engine block all traces of old hermetic (act carefully, - try not to damage surfaces of the components made of a soft aluminum alloy).

INSTALLATION

 PERFORMANCE ORDER

1. Replace an epiploon of a cranked shaft (see. Section Replacement of a forward epiploon of a cranked shaft).

Before installation of a sponge of a new epiploon it is necessary to grease with universal greasing.

2. Fill technical vaseline internal cavities of the pump. Establish a cover, grease with hermetic a carving of fixing screws, screw them and tighten in a diagonal order with demanded effort.
3. Carefully wipe the rags moistened in acetone all prokladochny surfaces, having completely removed about a bottom all traces of oil.
4. Slightly grease with anaerobny hermetic a surface of the case of the pump interfaced to the block, and also a carving part of fixing bolts. Be not overzealous, - track, that hermetic did not block маслотоки and did not get to deaf carving openings. Assembly of components should be made within five minutes after hermetic drawing, otherwise procedure should be repeated. Do not forget to replace sealing rings.
5. Having tracked, that лыски a leading gear wheel of the pump entered into gearing with reciprocal лысками on a pin of a cranked shaft, establish the pump on the regular place.
6. Screw fixing bolts and tighten them in a diagonal order with demanded effort.
7. Having replaced a sealing ring, establish into place a maslozabornik and tighten his fixture with demanded effort.
8. Installation of the remained components is made as it should be, the return to an order of their dismantle.
9. Wait about 20 minutes, let's stiffen hermetic, then fill in fresh engine oil, start the engine and check it on existence of leaks. Measure pressure of impellent oil.
10. Check level of impellent oil.