Honda Accord

1998-1999 of release

Repair and car operation



Honda Chord
+ Honda Accord brand Cars
+ Settings and routine maintenance
- Engine
   + Four-cylinder engines
   - V6 engines
      Preparatory actions and the list of repair procedures which can be executed without engine extraction from the car
      Reduction of the piston of the first cylinder in the provision of the top dead point (VMT)
      Removal and installation of covers of heads of cylinders
      Removal and installation of the inlet pipeline
      Removal and installation of final collectors
      Removal, check of a condition and installation of a gas-distributing belt and cogwheels of a drive of GRM
      Replacement of a forward epiploon of a cranked shaft
      VTEC system - the general information
      Removal, check of a condition and installation of assembly of yokes
      Removal, check of a condition and installation of camshafts
      Replacement of maslootrazhatelny caps and klapanny springs with plates
      Removal and installation of heads of cylinders
      Removal and installation of the pallet of a case of the engine
      Removal, check of a condition and installation of the oil pump
      Removal and installation of a driving disk
      Replacement of a back epiploon of a cranked shaft
      Check of a condition and replacement of support of a suspension bracket of the power unit (V6 Engines)
      System of correction of a suspension bracket of the power unit - the general information and check of serviceability of functioning
   + General and major maintenance of the engine
+ Systems of cooling, heating
+ Power supply system and release
+ engine Electric equipment
+ Engine management
+ gear shifting Box
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ electric equipment Schemes





Removal and installation of the pallet of a case of the engine

REMOVAL

 PERFORMANCE ORDER

1. Disconnect a negative wire from the battery.

If the stereosystem established on the car is equipped with a security code before disconnecting the battery make sure that have the correct combination for audiosystem input in action!

2. Prop up back wheels protivootkatny boots and cock the parking brake. To Poddomkratta a car front also establish it on props.
3. Remove protection of a case.
4. Merge impellent oil and remove the oil filter (see. Head of Control and routine maintenance).
5. To Otboltita section of reception pipes from final collectors (see. The section Removal and installation of final collectors) and a flange of the catalytic converter (see. Head of the Power supply system and release). Remove section of reception pipes of system of production of the fulfilled gases.
6. Give fixing bolts/nuts and lower the pallet. For an otdavaniye of bolts from the party of the pallet turned to a gas-distributing belt use a natural a flexible drive on 1/4 inches with a ratchet and a collar. The "become attached" pallet can be separated from the block by a poddevaniye way a screw-driver with the stupid sting, entered between ledges to flow.

At all do not enter a screw-driver between interfaced surfaces of the pallet and the block!

INSTALLATION

 PERFORMANCE ORDER

1. Accurately scratch out from interfaced surfaces of the pallet and the block all traces of hermetic and a material of old laying. Carefully wipe interfaced surfaces the rags moistened in acetone.
2. Clean and dry carving openings in the block.
3. Check a condition of assembly of a maslozabornik and passableness of its mesh filter (see. Section Removal, check of a condition and installation of the oil pump).
4. Lay on an interfaced surface of the pallet new sealing laying.
5. Accurately press the pallet to the block and screw fixture. In three stages tighten fixture with demanded effort. Begin a fixture tightening in the direction from the center to edges of the pallet, serially passing on the one hand to another. Remember that pulling of fixture is fraught with development of leaks.
6. Further assembly is made as it should be, the return to an order of dismantle of components. Do not forget to fill in new oil and to change the oil filter (see. Head of Control and routine maintenance).

If replacement of the oil pump was made, start to fill in oil only 20 minutes later after assembly, let's stiffen hermetic.

7. Fill in engine oil (see. Head of Control and routine maintenance), start the engine and check the pallet on existence of leaks.