Honda Accord

1998-1999 of release

Repair and car operation



Honda Chord
+ Honda Accord brand Cars
+ Settings and routine maintenance
- Engine
   - Four-cylinder engines
      Preparatory actions and the list of repair procedures which can be executed without engine extraction from the car
      Reduction of the piston of the first cylinder in the provision of the top dead point (VMT)
      Removal and installation of a cover of a head of cylinders
      VTEC system - the general information and check of a condition of components
      Removal, check of a condition and installation of assembly of yokes
      Replacement of maslootrazhatelny caps and klapanny springs with plates
      Removal and installation of the inlet pipeline
      Removal and installation of a final collector
      Removal, check of a condition and installation of cogwheels and belt of a drive of balancing shaft
      Removal, check of a condition and installation of a gas-distributing belt and cogwheels of a drive of GRM
      Replacement of a forward epiploon of a cranked shaft
      Removal, check of a condition and camshaft installation
      Removal and installation of a head of cylinders
      Removal and installation of the pallet of a case of the engine
      Removal, check of a condition and installation of the oil pump
      Removal and flywheel installation / driving disk
      Replacement of a back epiploon of a cranked shaft
      Check of a condition and replacement of support of a suspension bracket of the power unit
      System of correction of a suspension bracket of the power unit - the general information and check of serviceability of functioning
   + V6 Engines
   + General and major maintenance of the engine
+ Systems of cooling, heating
+ Power supply system and release
+ engine Electric equipment
+ Engine management
+ gear shifting Box
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ electric equipment Schemes





Removal and installation of the inlet pipeline

It is worth to remember that gasoline is inflammable liquid in the highest measure! At service of components of a power supply system observe all taken measures of fire safety. Does not smoke, do not come nearer to a venue of works with open fire or unprotected by the lamp shade carrying. Do not make system service in the room equipped with working at natural gas and heating devices equipped with a control torch (such as водогреи and dryers for clothes). Do not forget that gasoline is among the cancerogenic substances promoting development of a cancer,-. try not to allow fuel hits on open sites of a body. Use protective rubber gloves, at casual unforeseen contact carefully wash out hands warm water with soap. Immediately collect the spilled fuel and do not put the rags impregnated with a fuels and lubricants near sources of open fire. Remember that the power supply system equipped with injection of fuel of models constantly is under pressure. Before starting a detachment of fuel lines, dump residual pressure in system (for more details see. Head of the Power supply system and release). At service of components of a power supply system put on goggles. Constantly hold near at hand the class B fire extinguisher!

REMOVAL

 PERFORMANCE ORDER

1. Dump pressure in a power supply system (see. Head of the Power supply system and release), then disconnect a negative wire from the battery.

If the stereosystem established on the car is equipped with a security code before disconnecting the battery make sure that have the correct combination for audiosystem input in action!

2. Empty cooling system (see. Head of Control and routine maintenance).
3. Disconnect an inlet air line from air purifier assembly (see. Head of the Power supply system and release).
4. Having accurately marked, disconnect all disturbing to dismantle of the inlet pipeline electroconducting, and also vacuum lines.

5. Disconnect an accelerator cable from the throttle case cables of gas and a control system of speed (темпостата) (see. Head of the Power supply system and release), - do not liberate cables from an arm, and only give bolts of fastening of the last.

6. Remove from the inlet pipeline a thermostat casing.

7. Disconnect from the fuel highway of the line of giving and fuel return (see. Head of the Power supply system and release).

Pressure in system should be dumped beforehand (see paragraph 1)!

8. Working under the car, remove an assembly bracket supporting the inlet pipeline, previously having separated from it burn down electroconductings.

9. Turn out fixing bolts and remove the inlet pipeline from the engine.

The bottom pipeline can be removed together with the delivery chamber of an air path established on it (the top pipeline), however access to fixing bolts will essentially be facilitated, if the delivery chamber to remove in advance.

INSTALLATION

 PERFORMANCE ORDER

1. Wipe solvent of a nut of fastening of the inlet pipeline, then carefully dry them (whenever possible with application of the compressed air).

When using the compressed air do not forget to put on goggles!

2. Estimate planeness of interfaced surfaces of the pipeline by means of a special measuring instrument (the steel ruler put on an edge) and щупа lezviyny type. Compare results of measurements to requirements of Specifications.
3. Before installation of the EGR valve clean it a small brush with solvent, having carefully removed all accumulated deposits.
4. Examine the pipeline on existence of cracks and deformation signs. The defective pipeline is subject to a pro-point, or replacement.
5. Check a condition of fixture (bolts/hairpins) of the pipeline. Defective units replace.
6. Scratch out from interfaced surfaces of a head and the inlet pipeline traces of a material of old laying, then wipe surfaces the rags moistened in acetone.

7. Having picked up new sealing laying, establish the pipeline on the regular place and fix it, having tightened all nuts by hand. Operating in strictly certain order, tighten fixture with demanded effort (see. Specifications). If removed the delivery chamber, establish it on a place (do not forget to replace sealing laying).

8. Further installation is made as it should be, the return to a dismantle order. In summary do not forget to fill cooling system (see. Head of Control and routine maintenance).