Honda Accord

1998-1999 of release

Repair and car operation



Honda Chord
+ Honda Accord brand Cars
+ Settings and routine maintenance
- Engine
   - Four-cylinder engines
      Preparatory actions and the list of repair procedures which can be executed without engine extraction from the car
      Reduction of the piston of the first cylinder in the provision of the top dead point (VMT)
      Removal and installation of a cover of a head of cylinders
      VTEC system - the general information and check of a condition of components
      Removal, check of a condition and installation of assembly of yokes
      Replacement of maslootrazhatelny caps and klapanny springs with plates
      Removal and installation of the inlet pipeline
      Removal and installation of a final collector
      Removal, check of a condition and installation of cogwheels and belt of a drive of balancing shaft
      Removal, check of a condition and installation of a gas-distributing belt and cogwheels of a drive of GRM
      Replacement of a forward epiploon of a cranked shaft
      Removal, check of a condition and camshaft installation
      Removal and installation of a head of cylinders
      Removal and installation of the pallet of a case of the engine
      Removal, check of a condition and installation of the oil pump
      Removal and flywheel installation / driving disk
      Replacement of a back epiploon of a cranked shaft
      Check of a condition and replacement of support of a suspension bracket of the power unit
      System of correction of a suspension bracket of the power unit - the general information and check of serviceability of functioning
   + V6 Engines
   + General and major maintenance of the engine
+ Systems of cooling, heating
+ Power supply system and release
+ engine Electric equipment
+ Engine management
+ gear shifting Box
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ electric equipment Schemes





Removal and installation of a cover of a head of cylinders

REMOVAL

 PERFORMANCE ORDER

1. Disconnect a negative wire from the battery.

If the stereosystem established on the car is equipped with a security code before disconnecting the battery make sure that have the correct combination for audiosystem input in action!

2. Previously having marked, disconnect wire VV from spark plugs (see. Head of Control and routine maintenance).
3. Mark and disconnect all hoses and the wires disturbing to removal of a head.

4. Remove the PCV valve and disconnect from a cover of a head of cylinders a branch pipe сапуна.

5. Carefully wipe a cover in order to avoid garbage hit in a head cylinders/assembly of the klapanny mechanism.
6. Give a fastening bolt to a cover of a head of cylinders of the tire of grounding (from a gas-distributing belt).

7. Turn out bolts of fastening of a cover of a head of cylinders and remove them together with sealing washers.

8. Accurately uncover together with sealing laying. If laying подлипла to an interfaced surface of a head, обстучите a cover a hammer with soft brisk for the purpose of destruction of a layer of hermetic. At all do not undertake attempts to separate a cover by a poddevaniye it the lever entered between interfaced surfaces.

INSTALLATION

 PERFORMANCE ORDER

1. Take old laying from a landing flute in a cover of a head of cylinders, then carefully smooth out interfaced surfaces of a head of cylinders and its cover. Having scratched out traces of old hermetic and laying fragments, wipe surfaces the rags moistened in acetone.

The intact whole sealing laying in principle is subject to recycling.

2. Enclose new rubber laying in the landing flute on a flange of a cover of a head of cylinders. Establish the formed laying, having pushed it in a groove passing on perimeter of a cover. Impose a little RTV hermetic on corners where the interfaced surface of a cover of a head of cylinders is joined to covers of forward and back bearings of a camshaft. Wait about five minutes, waiting the moment of the beginning of polymerization of hermetic.

Make sure that the top layer of hermetic slightly hardened (wait about 10 minutes, but no more), after it start cover installation (in the conditions of the increased humidity polymerization of hermetic can begin with a small delay).

3. Establish a cover, lay sealing washers, screw fixing bolts and tighten them with demanded effort.
4. On models with VTEC before establishing a cover of a head of cylinders, check a condition of sealing washers of spark plugs.
5. Further installation is made as it should be, the return to a dismantle order.