Honda Accord

1998-1999 of release

Repair and car operation



Honda Chord
+ Honda Accord brand Cars
+ Settings and routine maintenance
- Engine
   - Four-cylinder engines
      Preparatory actions and the list of repair procedures which can be executed without engine extraction from the car
      Reduction of the piston of the first cylinder in the provision of the top dead point (VMT)
      Removal and installation of a cover of a head of cylinders
      VTEC system - the general information and check of a condition of components
      Removal, check of a condition and installation of assembly of yokes
      Replacement of maslootrazhatelny caps and klapanny springs with plates
      Removal and installation of the inlet pipeline
      Removal and installation of a final collector
      Removal, check of a condition and installation of cogwheels and belt of a drive of balancing shaft
      Removal, check of a condition and installation of a gas-distributing belt and cogwheels of a drive of GRM
      Replacement of a forward epiploon of a cranked shaft
      Removal, check of a condition and camshaft installation
      Removal and installation of a head of cylinders
      Removal and installation of the pallet of a case of the engine
      Removal, check of a condition and installation of the oil pump
      Removal and flywheel installation / driving disk
      Replacement of a back epiploon of a cranked shaft
      Check of a condition and replacement of support of a suspension bracket of the power unit
      System of correction of a suspension bracket of the power unit - the general information and check of serviceability of functioning
   + V6 Engines
   + General and major maintenance of the engine
+ Systems of cooling, heating
+ Power supply system and release
+ engine Electric equipment
+ Engine management
+ gear shifting Box
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ electric equipment Schemes





Replacement of a back epiploon of a cranked shaft

 PERFORMANCE ORDER

1. Remove a transmission (see. Head gear shifting Box).
2. Remove a flywheel / a driving disk (see. Section Removal and flywheel installation / driving disk).
3. Before extraction of an old epiploon surely measure depth of its landing (gap size between a face surface and external edge of the holder), - use a small ruler or Columbus. Write down results of measurement. The new epiploon should be planted strictly on the same depth.

4. Replacement of an epiploon can be made without preliminary dismantle of the pallet of a case and the holder of an epiploon. Having accurately hooked a screw-driver, take an old epiploon from a landing nest in the holder.

Not to damage a pin of a shaft or a wall of a nest wrap up a screw-driver sting rags.

5. Slightly grease edges of a pin and a sponge of a new epiploon with universal greasing, then, helping itself a blunt tool, put on an epiploon a shaft. By means of an opravka and a hammer plant an epiploon in a nest (as an opravka the face head of the corresponding size, or a piece of a pipe of suitable diameter [slightly less external diameter of an epiploon] can be used).

The description of procedure of replacement of an epiploon with demontazhy the holder is provided in the Part the General and major maintenance of the engine of the present Chapter.

6. Further installation is made as it should be, the return to a dismantle order.
7. Start the engine and check its existence of leakages of oil.